|
Central Texas Regional Mobility Authority:
A Need for a Higher Standard March 2005 |
Appendix 3 – Selected TxDOT Funding Categories
Categories
Number and Name
Programming Authority
Usual
Funding
Allocation
Program
(Yes/No),
Responsible Entity
Ranking Index or Allocation Formula
Brief Summary, Restrictions, Etc.
2
Metropolitan
Area Corridor
ProjectsCommission
approval.Project-specific
corridors selected statewide based on criteria to be determined. Projects scheduled
by consensus of districts.
Federal 80%
State 20%
or
State 100%
No,
Commission
Funding target formula
32.63 % Total vehicle miles traveled (on and off the state highway system)
22.35 % Population
17.04 % Lane miles (on system)
14.22 % Vehicle miles traveled (trucks only)
7.04 % Percentage of population under the federal poverty level
6.72 % Fatal and incapacitating crashes.
Mobility and added capacity projects on major state highway system corridors which serve the mobility needs of the Metropolitan Areas Metropolitan Planning Organizations.
7
Metropolitan
Mobility/
Rehabilitation
Commission
allocation.Allocation based on population.
Allocation
program to
districts. Projects selected by MPO in consultation with TxDOT.Federal 80%
State 20%
or
Federal 80%
Local 20%
or
State 100%
Yes,
Districts
Population (2000
Census).Transportation needs within metropolitan area boundaries with populations of 200,000 or greater. Projects selected by Metropolitan Planning Organizations.
11
District
Discretionary
Commission allocation by formula.
Allocation program to districts. Projects selected by districts. Minimum $2.5 million allocation to each district in compliance with 78(R), H.B. 1, Article VII, Rider 29.
Federal 80%
State 20%
or
Federal 80%
Local 20%
or
State 100%
Yes,
Districts
Allocation Formula
70% on-system vehicle miles traveled
20% on-system lane miles
10% Annual truck
vehicle miles traveled.Projects selected at the district’s discretion. Dollars may not be expended to offset overruns on previously selected projects and may not be used for right of way acquisition.
12
Strategic
PriorityCommission
selection.Project-specific.
Federal 80%
State 20%
or
State 100%
No,
Commission
Selected by Texas
TransportationCommission.
Commission selected projects that promote economic development, provide system continuity with adjoining states and Mexico, increase efficiency on military deployment routes or address other strategic needs as determined by the commission.
Source: Texas Department of Transportation.